CCT Installation & Upgrades—Avoid Delays and Compatibility Issues
Johnson Controls CCT Installation & Upgrade Guide
The Configuration and Commissioning Tool (CCT) is essential for programming and configuring FX Series controllers. Whether you're installing CCT for the first time or upgrading to a new version, following best practices ensures a smooth setup while avoiding common issues.
CCT Installation: Step-by-Step Guide
1. Check System Requirements
Before installing CCT, ensure your system meets these minimum requirements:- Operating System: Windows 10/11 (Professional or Enterprise recommended)
- RAM: 16GB or higher for optimal performance
- Storage: Minimum 20GB of free space
- Additional Software:
- .NET Framework 3.5 or higher
- Java Runtime Environment
- Adobe Reader
- Permissions: Administrator access to install software and drivers
2. Uninstall Older Versions
If you have CCT version 10.2 or older, uninstall it before installing a newer version. To check your version, open CCT, click Help > About.3. Install Required Dependencies
CCT requires certain software to function correctly:- If installing on a desktop operating system without SQL installed, CCT will automatically install SQL Server 2019 Express with CU18 (64-bit).
- Firewall Configuration: Allow connections on port 1433 to prevent SQL connection failures. To configure firewall settings:
- Navigate to Control Panel > System and Security > Windows Firewall.
- Add an exception for port 1433.
4. Set Up Your Network & Device Connection
For the best results:- Use a Wired Connection: A direct Ethernet or USB connection is recommended for initial setup.
- Configure Firewall & Antivirus: Add exceptions for CCT to prevent connection issues.
- Match IP Configuration: Ensure your computer’s network settings align with your controller’s IP range.
5. Back Up Existing Controller Data
Before making any changes:- Use CCT's Backup & Restore feature to save current configurations.
- Prevent data loss by storing backups securely before firmware updates or programming changes.
Updating and Upgrading CCT
- Check your Software Manager to verify if your CCT version is eligible for an update before purchasing a new license.
- CCT licenses can be updated within 12 months of purchase.
If your CCT license is not updatable, follow these steps to upgrade:
- Document Your System ID: Locate your system ID in CCT and email bas@stromquist.com with a request for a quote for a new license.
- Deactivate Old License Files: In CCT’s Software Manager, deactivate the existing license.
- Complete Purchase Process: Respond to the quote with your PO#, system ID, and confirmation that the old license has been deactivated.
- Install New License Files: Once received, install the new license in the Software Manager.
Final Tips for a Smooth CCT Experience
- Always verify firmware compatibility with your FX controllers before installation.
- Test communication between your PC and the controller before deploying changes.
- If using wireless connections, ensure drivers for USB or Bluetooth dongles are installed.
By following these best practices, you’ll streamline the installation and upgrade process, avoiding setup delays and compatibility issues.
Need help?
Contact Stromquist at bas@stromquist.com for expert support on FX controllers and CCT licensing!
Want to become an FX aprtner? Join here!
Tags
bas
ot
bas network
control panels
network configuration
port security
network control
smart buildings
energy management
building automation
ethernet based
bas network guidelines
tosibox
managed switches
distech
optimizer
commander
johnson controls
eclypse
network
security
cyber
iot
ul508a
industrial solutions
engineering solutions
panel assembly
custom control panels
commercial panels
gas regulator sizing
gas safety
inlet pressure
outlet pressure
flow rate
natural gas
propane regulators
subnet
it
managed ip switch
vlan setup
quality of service
qos
spanning tree protocol
stp
routing configuration
network management
lldp setup
energy efficiency ethernet
managed network switch benefits
ot network
energy savings
building solutions
connected power
building management
bms
transformers
din rail transformer
functional devices
transformer in a box
ai in real estate
cybersecurity
data integration
realcomm ibcon
sustainability
JCI
jci
sensors
controllers
interfaces
Posts
2025
January
2024
Blog | JCI CCT Installation & Upgrade Guide
[01/31/25 09:05 AM]
Blog | $1.6 Billion Cyber Attack
[01/30/25 08:48 AM]
Blog | Cybersecurity for Building Automation
[01/27/25 09:55 AM]
Atrius Facilities: Simplify Project Management with Organize
[01/07/25 11:24 AM]
Simplifying Niagara Framework® Management
[01/03/25 03:21 PM]
November
2023
Building Automation in 2024
[11/06/24 12:46 PM]
UL508A Control Panels: Engineered Solutions
[11/04/24 09:23 AM]
October
September
Preventative Maintenance for York Chillers: Why It Matters
[09/24/24 09:42 AM]
Maximize Field Efficiency with the Connected Workflow Application (CWa)
[09/18/24 11:35 AM]
Tosibox: Simplifying Secure Connectivity for Building Automation
[09/18/24 10:35 AM]
August
Mastering Subnetting: How to Create a Secure and Efficient Subnet
[08/27/24 02:42 PM]
Comprehensive Guide to Setting Up a Managed IP Switch
[08/26/24 03:02 PM]
Why use a managed switch on an OT network?
[08/21/24 03:37 PM]
Connected Power: Energy Waste Solution
[08/14/24 10:57 AM]
Simplified Transformer Installation
[08/12/24 09:58 AM]
July
Realcomm IBCON 2024 Takeaways
[07/30/24 08:23 AM]
Ethernet based Network Types found in OT networks
[07/26/24 11:24 AM]
Ethernet based BAS Network Guidelines
[07/26/24 09:41 AM]
Benefits of Building Automation Systems
[07/05/24 09:01 AM]
June
July 4th | Independence Day Closure
[06/28/24 09:38 AM]
July 2024 N4 Certification Class
[06/28/24 09:25 AM]
Our Suppliers are Award Winners
[06/13/24 10:46 AM]
May
Essential HVAC Sensors for Improving IAQ and Building Efficiency
[05/23/24 08:52 AM]
Distech Controls Highlight
[05/22/24 08:46 AM]
Memorial Day Closure
[05/21/24 12:09 PM]
April
School HVAC and BAS Updates
[04/22/24 09:55 AM]
Update Your Tosibox Lock 100
[04/17/24 09:58 AM]
Create Your Own Quote Tool
[04/17/24 08:58 AM]
Tosibox Remote Connectivity
[04/04/24 09:12 AM]
Building Automation and Internet of Things (IoT) Unite
[04/03/24 08:35 AM]
March
Belimo Retrofit: HVAC Solutions
[03/15/24 04:19 PM]
May 2024 N4 Certification Class
[03/14/24 10:39 AM]
Tosibox Hub: Seamless Connectivity
[03/12/24 10:32 AM]
Spyder 7 & Optimizer Unitary Technical Training
[03/04/24 03:37 PM]
February
Explore the Features of Stromquist.com
[02/29/24 08:19 AM]
JACE 9000 vs 8000: Key Differences
[02/02/24 10:54 AM]
HVAC Trends in 2024
[02/01/24 10:02 AM]
January
TC300 Commercial Thermostat
[01/29/24 04:17 PM]
Seamless Building Automation: ILC 2050 BI
[01/24/24 01:31 PM]
TC500A-N Commercial Thermostat
[01/23/24 11:35 AM]
OT Security - Eliminating Threats
[01/23/24 10:21 AM]
2024 N4 Certification Class Schedule
[01/11/24 03:14 PM]
Honeywell End of Life Dates
[01/10/24 09:38 AM]
JACE 9000 Controller for Niagara 4
[01/10/24 09:08 AM]
Globe Valves vs Ball Valves
[01/10/24 12:00 AM]
December
November
2022
Christmas Hours - Stromquist Closure
[11/30/23 10:28 AM]
Distech Supply Chain Issues
[11/21/23 09:51 AM]
December 2023 N4 Certification Class
[11/10/23 09:37 AM]
October
Gas Monitoring Made Easy with Belimo
[10/19/23 08:44 AM]
Enhancing Fire Safety: Belimo's Solutions
[10/18/23 10:07 AM]
License Visibility Change
[10/06/23 03:14 PM]
Future of Building Automation Controls
[10/03/23 03:33 PM]
September
VFDs with Bypass Are Here
[09/27/23 07:55 AM]
Honeywell Optimizer Building Controllers
[09/18/23 02:04 PM]
Need Gas Detection Help? Stromquist Can help
[09/12/23 11:13 AM]
Enjoy Retirement Bill Jones
[09/11/23 02:54 PM]
Price Increase for Distech Controls
[09/11/23 01:04 PM]
Your Source for York
[09/08/23 08:54 AM]
August
Verasys | Commercial Control
[08/08/23 03:54 PM]
KMC Counter Day | Orlando, FL
[08/08/23 01:55 PM]
Wireless MS/TP Converter - New MAP Gateway
[08/04/23 03:00 PM]
July
What is a Relay? How do Relays Work?
[07/27/23 09:49 AM]
Tosibox Platform | OT Network Solutions
[07/24/23 11:30 AM]
The RIB® Trifecta
[07/20/23 04:00 PM]
August 2023 | N4 Certification Class
[07/20/23 10:44 AM]
4 Things to Know About Current Sensors
[07/10/23 03:18 PM]
How to Properly Install Butterfly Valves
[07/06/23 11:01 AM]
June
Common Abbreviations | Belimo
[06/21/23 09:05 AM]
Stromquist Regulator Webinar
[06/19/23 10:46 AM]
Gas Sensor Mounting Heights | ACI
[06/01/23 09:01 AM]
May
SMART BUILDING INTEGRATOR SUMMIT (SBIS)
[05/24/23 10:31 AM]
Honeywell VFD Lunch & Learn Certification
[05/24/23 09:44 AM]
Honeywell Flame Safeguard Training
[05/24/23 09:44 AM]
VFD Supply Chain Update
[05/22/23 12:56 PM]
Versatile RIB Relays
[05/17/23 08:51 AM]
JCI Solutions Navigator
[05/08/23 09:54 AM]
New Honeywell Smart VFDs
[05/02/23 01:21 PM]
New FX 3D Graphics
[05/02/23 10:33 AM]
April
What's New with Facility Explorer
[04/26/23 09:42 AM]
Industry Leading CO2 and Temperature Sensors
[04/19/23 09:39 AM]
What is CV, & How to Calculate it?
[04/19/23 09:12 AM]
March
December
Stromquist & Company | Easter Jours
[12/12/22 12:00 AM]
Stromquist & Company | 2022 Holiday Hours
[12/12/22 12:00 AM]
November
October
Engineered Solutions | Panel Shop
[10/26/22 10:45 AM]
Engineered Solutions | CCP Panels
[10/11/22 10:45 AM]
Engineered Solutions | Fuel Trains
[10/06/22 10:45 AM]
September
Engineered Solutions
[09/30/22 04:22 PM]
Atlanta Fast Lane
[09/22/22 10:28 AM]
Stromquist Website Updates
[09/13/22 10:15 AM]
DC2500/3200 are Obsolete
[09/07/22 02:54 PM]
Stromquist Selection Guides
[09/07/22 02:54 PM]
August
Honeywell Mod Motor Identification
[08/26/22 09:39 AM]
Variable Frequency Drive Update
[08/23/22 01:57 PM]
Apogee TEC Sensors
[08/23/22 01:57 PM]
ASCO™ Series 158 and 159
[08/23/22 01:57 PM]
The Importance of Relief Valves
[08/18/22 03:24 PM]
Testing a M91XX Mod Motor
[08/16/22 03:15 PM]
Ohms Law Explained
[08/08/22 03:07 PM]
Identifying Honeywell Parts
[08/04/22 03:16 PM]
July